Difference between revisions of "Team:Cornell/Notebook"

(Add styling to remove bullets from toolkit dropdown menu)
Line 20: Line 20:
 
         }
 
         }
  
         /* removes default styling for home banner tagline */
+
         /* removes default styling for home banner tagline  
 
         #HQ_page p {
 
         #HQ_page p {
 
             font-family: 'Opens Sans', sans-serif;
 
             font-family: 'Opens Sans', sans-serif;
 
             font-size: 16px;
 
             font-size: 16px;
         }
+
         } */
  
 
         /* removes small extra margin at very bottom below footer */
 
         /* removes small extra margin at very bottom below footer */

Revision as of 19:48, 6 October 2018

Team:Cornell/Notebook - 2018.igem.org

Notebook
March 4th to March 10th

Wet Lab: New members began training by learning about sterile technique, bacterial cultures, and DNA purification. Team practiced miniprep protocols.

Wiki: Wiki subteam learned the importance of typography during a one-hour long Wiki/Design Training class. Worked on the webpage replication project to practice Adobe Illustrator (due 3/18).

P & P: On February 27th, P&P worked with YOURS to teach kids about physics and engineering principles by building paper towers to hold up as many books as possible. P&P regrouped to discuss this program and to continue brainstorming for future outreach events. P&P continued brainstorming other outreach events and ideas with the intention of reaching out to the kids at the local Ithaca High school.

March 11th to March 17th

Wet Lab: Members split into training groups and performed PCR on gBlocks from last year’s project. Training involved overviews and run-throughs of cloning, transformation, miniprep, gel extraction, and other protocols.

Wiki: Wiki subteam learned the basics of HTML and CSS during a one-hour long Wiki/Design Training class. Worked on the HTML/CSS project (due 3/26).

P & P: P&P started planning and finding information for a synthetic biology discussion. Also brainstormed for activities for the annual student outreach event - Splash! at Cornell.

March 18th to March 24th

Wiki: Wiki subteam learned the basics of colors, white space, and composition during a one-hour long Wiki/Design Training class. Worked on webpage creation project to practice building information hierarchy (due 4/8).

P & P: P&P brainstormed applications for two possible projects for the team - incorporating synthetic biology with 3D printing or with fourier transforms/band-pass filters.

March 25th to March 31st

Wiki: Wiki subteam learned the basics of JavaScript and jQuery during a one-hour long Wiki/Design Training class. Worked on the JavaScript/jQuery project (due 4/13).

P & P: P&P started finding research contacts to consult for technical advice on creating a band-pass filter in bacteria. P&P compiled a list of questions for the interviews to inform our biological circuit design.

April 8th to April 14th

Wiki: Wiki subteam evaluated past competition winners’ websites and our past competition websites during a one-hour long Wiki/Design Training class. Worked on designing a webpage for our current project (due 4/23).

P & P: P&P consulted Professor G. Lambert on April 9th regarding our preliminary design of our genetic circuit and any potential issues with the project. On April 10th, P&P interviewed Professor E. Kan about the similar design principles connecting electrical engineering to genetic circuit engineering.

April 15th to April 21st

Wiki: Wiki subteam learned the basics of Bootstrap and Git/GitHub during a one-hour long Wiki/Design Training class. Worked on the Bootstrap/Github project (due 4/30).

P & P: P&P interviewed Professor J. March on April 20th for assistance in choosing specific protein candidates for our genetic circuit. The discussion also addressed control of circuit kinetics via protein degradation and plasmid copy number and potential applications for our project. P&P also continued planning for Splash! and RawExpo, a creative exposition at the architecture school.

Business: Business held their National Garlic Day fundraiser on 4/19 - earned some money and spread the word about iGEM!

April 22nd to April 28th

Wet Lab: Wetlab continued training. Members performed a double digestion and practiced using a NanoDrop Spectrophotometer.

Wiki: Wiki subteam met up to discuss iGEM wiki rules and go over the general timeline for the summer and fall.

P & P: The first day of Ithaca High School (IHS) outreach took place on 4/26. P&P introduced Future Problem Solving (FPS) approaches and assigned readings for first topic (spread of infectious diseases).
On April 27th, P&P participated in RawExpo and presented last year’s project, Oxyponics.
P&P hosted an outreach event on April 28th as part of Splash! at Cornell U. We introduced synthetic biology topics including DNA extraction, plasmid transformation, and CRISPR.

April 29th to May 5th

Wet Lab: Members practiced double digest and ligation of digested inserts into pSB1C3 vector.

P & P: P&P continued IHS outreach on 5/3 by going over a practice FPS future scenario about the spread of infectious diseases and introducing the problem-solving process.

May 6th to May 12th

P & P: P&P continued reaching out to faculty and experts for consultation on our band-pass filter biological circuit and mapped out the schedule for summer work.

June 3rd to June 9th

Wiki: Started discussing possible concepts to consider for the 2018 wiki design, such as going with a dark color scheme (not necessarily black, something more along the lines of a dark color like navy blue) and incorporating geometric aspects. Also went over some brainstorming already done in April.

June 10th to June 16th

Wiki: Discussed idea of using templates to make implementation of the wiki easier. Assignment to look up templates that could work for possible wiki designs for 2018 project.

June 17th to June 23rd

Wet Lab: We had our first team meeting on Thursday the 21st where we outlined goals for the summer. We also had a group training session on Sunday the 23rd to complete training for new members. In the lab, we attempted to transform stock PSB1C3 into NEB 5-alpha Competent E. coli, however the transformation was not successful.

Product Development:

Wiki: Discussed themes we found that represented elements we would like to see in a potential wiki design. Reached out to team lead for more information and clarification on the project and Product Development’s role.

P & P: P&P outlined the events and goals for the summer while planning for 4-H. One major goal was to finish creating a customizable plasmid kit and to use it for collaboration.

June 24th to June 30th

Wet Lab: Wet Lab ran PCR reactions for PhrpL and sigmaF and Confirmed the lengths of each construct by running through a gel. The PCR was cleaned up and nanodropped resulting in high DNA concentration. Wet Lab began a wet culture from NEB 5-alpha E. coli transformed with PSB1c3. The wet culture was miniprepped and then ran through a gel. However, no bands were visible for PSB1C3 indicating an unsuccessful miniprep.

Product Development:

P & P: P&P taught a class on synthetic biology during 4-H career explorations on June 27th. Various topics were introduced, including CRISPR, DNA extraction, and phage transduction/plasmid transformation. The first iteration of the plasmid kit was laser cut and used at 4-H. We asked the students about their opinions on its use in pedagogy for feedback to improve our design. P&P began pursuing an educational collaboration with the Greater Ithaca Activities Center nearby.
P&P also began reaching out to professors at Washington University in St. Louis for consultation on our band-pass filter biological circuit.

July 1st to July 7th

Wet Lab: We ran PCR on our DNA constructs PhrpL, Sigmaf, and PF2. After several failed attempts, the lengths of each construct was confirmed by running a gel and nanodropping to determine the respective concentrations of each construct.

Wiki: Called together three of our Wiki subteam members to help design the wiki this summer. Went over the project description to catch up other members of the design team. Assigned each design member to make mock-up(s) of a home page (due 7/12).

P & P: P&P reflected on 4-H and the feedback about the plasmid kit. Issues included its transparent color, lack of visibility, and difficulty in assembly. A new plasmid kit was designed for laser cutting. P&P also worked on consolidating materials for IHS outreach in the fall and reached out to the NY Affiliate Director.

July 8th to July 14th

Wet Lab: We ran PCR on our DNA constructs PhrpL, Sigmaf, PF2, High pass 1b, Low pass 1b. Confirmed the lengths of each construct by running through a gel. Miniprepped PSB1C3 bacteria with low yields.

Wiki: Design team went over each member’s home page design. Discussed what we liked/disliked for each person’s design. Picked best design out of the three. Assigned each design member to edit the chosen home page design (due 7/17).

P & P: On July 9th, P&P interviewed Professor M. DeLisa, who interrogated the circuit design, provided suggestions on the placement different protein degradation tags on different components of the system. P&P also consulted him on the emerging technology and public opinion side of synthetic biology.
On July 10th, P&P interviewed Professor G. Lambert about modelling and testing the biological circuit.
P&P continued brainstorming potential outreach events, including a hackathon and activities for Ithaca High School in the Fall.

July 15th to July 21st

Wet Lab: Team ligated Phrpl, mf-lon, High Pass 1b and Low Pass 1b into pSB1C3 vectors. Team unsuccessfully attempted to transform plasmids into competent cells on chloramphenicol plates.

Wiki: Design team went over each team member’s revised home page design and listed out what features/components to include for the final home page design. Reached out to leads and former members who contributed to design for feedback. Assigned each design member to make mock-up(s) of sub-page (due 7/21).
Design team went over sub-page designs and listed out what features/components to include for final sub-page design. Designated assignments for making team page design, notebook/attributes page design, and looking into incorporating animation into the wiki (due).

P & P: On July 17th, P&P hosted a workshop at GIAC about synthetic biology teaching 1st graders about parts of a cell by representing different parts with different candies. Additionally, the plasmid kit was painted with methods that did not give a good final aesthetic. P&P contacted NY 4H for outreach opportunities at the upcoming NY State fair.

July 22nd to July 28th

Wet Lab: Wet Lab PCRed High Pass 1a, High Pass 1b and Low Pass 1c. We ran the PCR product on a gel, which confirmed a successful PCR. We then cleaned up the PCR product and nanodropped the cleanups. The PCR cleanup was cleaned up, while PSB1c3 was linearized and digested. The digestion were cleaned up and nanodropped. Wet Lab also miniprepped a wet culture that had been started earlier in the week of PSB1C3 transformed bacteria and nanodropped the results.

P & P: On July 24th, P&P returned to GIAC and made aluminum boats with the kids to learn about engineering principles, buoyancy, and physics. Plasmid kits were designed, cut, and painted for testing for UT-Austin

July 29th to August 4th

Wet Lab: We ligated previously digested High Pass 1a and High Pass 1b into pSB1C3 (to create High Pass 2a) as well as High Pass 1a and High Pass 1c into pSB1C3 (to create high Pass 2b). We performed PCR reactions for some parts we were running low on and then digested and ligated mf-Lon, sigmaF, and PhrpL, High Pass 1a, High Pass 1b, High Pass 1c, Low Pass 1b, and Low Pass 1c individually into pSB1C3 vectors. We heat inactivated and transformed our ligations into NEB 5-alpha Competent E. coli. Since we had been having trouble with transformations, we used SOC instead of LB for our outgrowth steps, with a positive outcome - colonies grew on all plates. We used isolated colonies to inoculate 5 mL liquid cultures which we miniprepped after overnight incubations. We also performed colony PCR reactions on assembled pSB1C3 vectors with High Pass 2a and and mf-lon inserts. We will continue with colony PCRs and run gels for them next week.

Wiki: Design team discussed and made final decisions for sub-page and team page designs. Went over and made final decisions for animation. Assigned design team members to make these finalized designs.

P & P: On July 31st, P&P played polymerase tag and made oobleck with the kids at GIAC. P&P interviewed Dr. L. Pierce and Dr. N. Argyres of Washington University in St. Louis in two separate interviews on 8/1 about the potential risks and regulations relevant to our project (see interview notes for specific interview contents).

August 5th to August 11th

Wiki: Wiki started setting up the internal structure of the wiki. Wiki set up the wiki repository.

P & P: P&P interviewed Professor Swingle on August 6th, focusing on understanding methods to test and gather characterization data for modeling of the proteins HrpR and HrpS, which are integral to the biological circuit. New plasmid kits were ready for laser cutting, but the laser cutter was down.

August 12th to August 18th

Wiki: Wiki started setting up the layout of the home page and considering what kind of framework to use to set up the layout.

August 19th to August 25th

Wiki: Wiki decided to use CSS grid to implement the layout of the wiki. Wiki did more setup of the wiki.

P & P: P&P had a Skype call interview on 8/22 with Professor M. Baccara from Washington University in St. Louis about the process and ethics of moving a product from science to business.
P&P resumed work on the project, outlining the fall semester outreach events and synthesizing information from various human practices and policies readings and interviews with experts.
P&P met with the IHS teacher on 8/24 to go over lesson plans and how FPS might fit in with the BioBuilder Club activities for the fall semester.

August 26th to Septmeber 1st

Wiki: Wiki had its first weekly subteam meeting. Wiki started implementing the nav bar, footer, home page, and standard page template.

P & P: P&P worked on state fair materials, including a trifold and portable plasmid kits for our outreach efforts on 9/3.

September 2nd to September 8th

Wet Lab:

Product Development:

Wiki:

P & P:

Business:

September 9th to September 15th

Wet Lab:

Product Development:

Wiki:

P & P:

Business:

September 16th to September 22nd

Wet Lab:

Product Development:

Wiki:

P & P:

Business:

September 23rd to September 29th

Wet Lab:

Product Development:

Wiki:

P & P:

Business:

September 30th to October 6th

Wet Lab:

Product Development:

Wiki:

P & P:

Business:

October 7th to October 13th

Wet Lab:

Product Development:

Wiki:

P & P:

Business:

October 14th to October 16th

Wet Lab:

Product Development:

Wiki:

P & P:

Business: