(4 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
− | + | <div class="clear"></div> | |
− | + | <div class="column full_size"> | |
− | + | <table> | |
+ | <h6> | ||
+ | <tr> | ||
+ | <th width="29%" valign="top"><p align="left"><strong>Bronze</strong></p></th> | ||
+ | <th width="38%" valign="top"><p align="left"><strong>Silver</strong></p></th> | ||
+ | <th width="31%" valign="top"><p align="left"><strong>Gold</strong></p></th> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td width="29%" valign="top"><p align="left">We are very honored to present our results to the judges on behalf of SCUT at the 2018 iGEM Giant Jamboree.</p></td> | ||
+ | <td width="38%" valign="top"><p align="left">We have standardized several modules in our project and have submitted samples by the deadline. Our modules like terminators and SpyTag/Catcher all work as expected. (read more)</p></td> | ||
+ | <td width="31%" valign="top"><p align="left">We conducted a series of surveys and communications to allow our work to interact with society thereby improving our projects in the feedback we receive. (read more)</p></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td width="29%" valign="top"><p align="left">We completed all required deliverables, including wiki, poster, presentation and judging form. (read more)</p></td> | ||
+ | <td width="38%" valign="top"><p align="left">we have carried out further cooperation and communication with the two iGEM teams: SYSU-Software and SCAU-China. (read more)</p></td> | ||
+ | <td width="31%" valign="top"><p align="left">We built a model that is based on Flux Balance Analysis and Gradient Descent, used to help us design our project. The model is visible and interpretive, and can be easily understand by others. (read more)</p></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td width="29%" valign="top"><p align="left">We created the attribution page in the wiki to clearly attribute works done by our team members. (read more)</p></td> | ||
+ | <td width="38%" valign="top"><p align="left">We have done lots to work on our human practice, including self-enhancement, safety, education, public engagement. (read more)</p></td> | ||
+ | <td width="31%" valign="top"></td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td width="29%" valign="top"><p align="left">We participated in this year's interlab study and our results were successfully accepted. (read more)</p></td> | ||
+ | <td width="38%" valign="top"></td> | ||
+ | <td width="31%" valign="top"></td> | ||
+ | </tr> | ||
+ | </h6> | ||
+ | </table> | ||
+ | </div> | ||
Latest revision as of 20:35, 17 October 2018
Bronze |
Silver |
Gold |
---|---|---|
We are very honored to present our results to the judges on behalf of SCUT at the 2018 iGEM Giant Jamboree. |
We have standardized several modules in our project and have submitted samples by the deadline. Our modules like terminators and SpyTag/Catcher all work as expected. (read more) |
We conducted a series of surveys and communications to allow our work to interact with society thereby improving our projects in the feedback we receive. (read more) |
We completed all required deliverables, including wiki, poster, presentation and judging form. (read more) |
we have carried out further cooperation and communication with the two iGEM teams: SYSU-Software and SCAU-China. (read more) |
We built a model that is based on Flux Balance Analysis and Gradient Descent, used to help us design our project. The model is visible and interpretive, and can be easily understand by others. (read more) |
We created the attribution page in the wiki to clearly attribute works done by our team members. (read more) |
We have done lots to work on our human practice, including self-enhancement, safety, education, public engagement. (read more) |
|
We participated in this year's interlab study and our results were successfully accepted. (read more) |