Difference between revisions of "Team:NU Kazakhstan/Project Timeline"

Line 27: Line 27:
 
     position: absolute;
 
     position: absolute;
 
     border-radius: 50%;
 
     border-radius: 50%;
     border: 3px solid #22c0e8;
+
     border: 3px solid #1aa780;
 
     left: 20px;
 
     left: 20px;
 
     width: 20px;
 
     width: 20px;
Line 145: Line 145:
 
<div class="container mt-5 mb-5">
 
<div class="container mt-5 mb-5">
 
<div class="row">
 
<div class="row">
<div class="col-md-6 offset-md-3">
+
<h4><b id="week1"><u>WEEK 1 (April 30 - May 6)</u></b></h4>
<h4>Latest News</h4>
+
 
<ul class="timeline">
 
<ul class="timeline">
 
<li>
 
<li>
<a target="_blank" href="https://www.totoprayogo.com/#">New Web Design</a>
+
<a href="#" class="float-right">21 March, 2014</a>
+
<a href="#" class="float-right">5 May 2018</a>
<p>Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque scelerisque diam non nisi semper, et elementum lorem ornare. Maecenas placerat facilisis mollis. Duis sagittis ligula in sodales vehicula....</p>
+
<p>BG-11 medium was prepared.</p>
</li>
+
<p>Inoculation of the BG-11 medium with cyanobacteria (Synechococcus elongatus PCC 7942) was done.</p>
<li>
+
<a href="#">21 000 Job Seekers</a>
+
<a href="#" class="float-right">4 March, 2014</a>
+
<p>Curabitur purus sem, malesuada eu luctus eget, suscipit sed turpis. Nam pellentesque felis vitae justo accumsan, sed semper nisi sollicitudin...</p>
+
</li>
+
<li>
+
<a href="#">Awesome Employers</a>
+
<a href="#" class="float-right">1 April, 2014</a>
+
<p>Fusce ullamcorper ligula sit amet quam accumsan aliquet. Sed nulla odio, tincidunt vitae nunc vitae, mollis pharetra velit. Sed nec tempor nibh...</p>
+
 
</li>
 
</li>
 +
 
</ul>
 
</ul>
</div>
 
 
</div>
 
</div>
 
</div>
 
</div>
 
<small>
 
<small>
<b id="week1"><u>WEEK 1 (April 30 - May 6)</u></b><br>
+
<u>05/05/18</u><br>
+
<p>BG-11 medium was prepared.</p>
+
<p>Inoculation of the BG-11 medium with cyanobacteria (Synechococcus elongatus PCC 7942) was done.</p><br>
+
<br>
+
 
+
 
<b id="week2"><u>WEEK 2 (May 7 - May 13)</u></b>
 
<b id="week2"><u>WEEK 2 (May 7 - May 13)</u></b>
 
<u>11/05/18</u><br>
 
<u>11/05/18</u><br>

Revision as of 19:35, 17 October 2018

Bioremediation of Sour Crude Oil Waste using Cyanobacteria




Week 1 April 30 - May 6
Week 2 May 7 - May 13
Week 3 May 14 - May 20
Week 4 May 21 - May 27
Week 5 May 28 – June 3
Week 6 June 4 – June 10
Week 7 June 11 – June 17
Week 8 June 18 – June 24
Week 9 June 25 – July 1

WEEK 1 (April 30 - May 6)

  • 5 May 2018

    BG-11 medium was prepared.

    Inoculation of the BG-11 medium with cyanobacteria (Synechococcus elongatus PCC 7942) was done.

WEEK 2 (May 7 - May 13) 11/05/18

BG-11 agar plates were made.

Cyanobacteria were plated onto BG-11 agar plates from liquid culture.



WEEK 3 (May 14 - May 20)
14/05/18

The new subculture of cyanobacteria was prepared from old liquid culture.

The old liquid culture of cyanobacteria was plated onto BG -11 agar plate.


16/05/18

BG-11 agar plates were prepared.

Cyanobacteria from liquid culture were plated onto the BG-11 agar plates.



WEEK 4 (May 21 - May 27) 25/05/18

OD of liquid cyanobacteria culture was measured

Liquid cultures of cyanobacteria were checked.

The new subculture of cyanobacteria was prepared from old liquid culture.