Line 84: | Line 84: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | <td><a href="# | + | <td><a href="#week4" style="color: #1aa780;" class="topLink">Week 4</a></td> |
<td>May 21 - May 27</td> | <td>May 21 - May 27</td> | ||
</tr> | </tr> | ||
Line 166: | Line 166: | ||
<br> | <br> | ||
− | <h4><b id=" | + | <h4><b id="week3"><u>WEEK 3 (May 14 - May 20)</u></b></h4> |
<ul class="timeline"> | <ul class="timeline"> | ||
<li> | <li> | ||
Line 180: | Line 180: | ||
</ul> | </ul> | ||
<br> | <br> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<br> | <br> | ||
<h4><b id="week4"><u>WEEK 4 (May 21 - May 27)</u></b></h4> | <h4><b id="week4"><u>WEEK 4 (May 21 - May 27)</u></b></h4> | ||
− | <ul class="timeline"> | + | <ul class="timeline tada wow"> |
<li> | <li> | ||
<a href="#" class="float-right">25 May 2018</a> | <a href="#" class="float-right">25 May 2018</a> |
Revision as of 19:52, 17 October 2018
Week 5 | May 28 – June 3 |
Week 6 | June 4 – June 10 |
Week 7 | June 11 – June 17 |
Week 8 | June 18 – June 24 |
Week 9 | June 25 – July 1 |
WEEK 1 (April 30 - May 6)
-
5 May 2018
BG-11 medium was prepared.
Inoculation of the BG-11 medium with cyanobacteria (Synechococcus elongatus PCC 7942) was done.
WEEK 2 (May 7 - May 13)
-
11 May 2018
BG-11 agar plates were made.
Cyanobacteria were plated onto BG-11 agar plates from liquid culture
WEEK 3 (May 14 - May 20)
-
14 May 2018
The new subculture of cyanobacteria was prepared from old liquid culture.
The old liquid culture of cyanobacteria was plated onto BG -11 agar plate.
-
16 May 2018
BG-11 agar plates were prepared.
Cyanobacteria from liquid culture were plated onto the BG-11 agar plates.
WEEK 4 (May 21 - May 27)
-
25 May 2018
OD of liquid cyanobacteria culture was measured
Liquid cultures of cyanobacteria were checked.
The new subculture of cyanobacteria was prepared from old liquid culture.