Week 5 | May 28 – June 3 |
Week 6 | June 4 – June 10 |
Week 7 | June 11 – June 17 |
Week 8 | June 18 – June 24 |
Week 9 | June 25 – July 1 |
WEEK 1 (April 30 - May 6)
05/05/18
WEEK 2 (May 7 - May 13) 11/05/18
WEEK 3 (May 14 - May 20)
14/05/18
16/05/18
WEEK 4 (May 21 - May 27) 25/05/18
05/05/18
BG-11 medium was prepared.
Inoculation of the BG-11 medium with cyanobacteria (Synechococcus elongatus PCC 7942) was done.
WEEK 2 (May 7 - May 13) 11/05/18
BG-11 agar plates were made.
Cyanobacteria were plated onto BG-11 agar plates from liquid culture.
WEEK 3 (May 14 - May 20)
14/05/18
The new subculture of cyanobacteria was prepared from old liquid culture.
The old liquid culture of cyanobacteria was plated onto BG -11 agar plate.
16/05/18
BG-11 agar plates were prepared.
Cyanobacteria from liquid culture were plated onto the BG-11 agar plates.
WEEK 4 (May 21 - May 27) 25/05/18
OD of liquid cyanobacteria culture was measured
Liquid cultures of cyanobacteria were checked.
The new subculture of cyanobacteria was prepared from old liquid culture.